Test bench automation. From measurement to results.
Connect test management with instrument integration and measurement recording. Keep plans, operator steps, process status and results in the same test context.
30-minute discussion ↗Separate test workflows, data and reports make it difficult to trace how results were produced.
Who is it for? Production test, product validation and quality teams.
- Manage test plans and operator steps together.
- View process status, measurement records and results in context.
- Expand the modular scope with your bench count and requirements.
Connect operator workflow and measurements
Associate test plans and operator steps with instrument connectivity, measurement sessions and process status. Define which records support each step in the test scenario.
An existing bench or a new installation
Define integration around working instruments on the existing bench. Where a new system is required, hardware selection, procurement and commissioning are separate project items.
Select the modules you need
Start with instrument, measurement and reporting scope for data acquisition. Add Test Management for plans and operator workflows; define analysis and AI scope separately around your requirements.
From data to charts and reports.
The current LabOS demo shows five channels and 27,000 recorded points. The chart and report use the same test recording, preserving sources and units.
29 October 2026 · Actual LabOS interface shown in Turkish, synthetic demo data. These images are not customer measurements or evidence of field performance.
Getting started
- 01
Define the test workflow and operator steps.
- 02
Map instrument connections and recording needs.
- 03
Manage test status, data and reports together.
Frequently asked questions
Can we start with an existing test bench?
Yes. Integration and test management scope can be defined around the working instruments and infrastructure.
Can you supply a new test system?
A turnkey data acquisition and test system covering hardware and software can be provided within the project scope.
How is pricing determined?
The proposal covers the Core platform, selected modules, capacity and setup/integration scope. An annual software license option is available.
How is the test bench scope defined in the first meeting?
We review your instrument list, test steps, required measurements and expected report together. Existing connection hardware and any additional hardware are assessed separately. Data acquisition, test management and analysis modules are selected to meet your requirements.
The software scope you need.
Modules and capacity follow your requirements. An annual software license option is available; instrument integration and installation scope are defined in the proposal.
Annual rental refers to the software license.Contact us about your project.
Share your instruments and test requirements. Let’s define the integration and software scope together.
Phone and WhatsApp: Atıl Fırat
+90 543 942 01 18

